Our Project Implementation

Sub-Station Construction

A switching station is a substation without transformers and operating only at a

Solar on Network Tower

Renewable options also become much more viable as the amount of

CIRDZ POWER INTERGRATION CONTROL SYSTEM

The electricity generated from renewable sources is becoming more available. The

Muzuma 330 – 132 – 88 kv substation

An electrical substation is an auxiliary station of an electricity generation, transmission and

Luampa-Substation

A switching station is a substation without transformers and operating only at a

Milonga mission solar installation

A switching station is a substation without transformers and operating only at a

PHI Substation 33 – 11 kv Civils and control room

A switching station is a substation without transformers and operating only at a

CIDRZ IN KALINGALINGA

This installation is at CIDRZ IN KALINGALINGA LUSAKA. It is an

Do You Still Have A Question Regarding Our Services?

There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration.